MATERIAL Operation time LABOR Machine Tools & Fixtures & .. Tooling - Ware Parts OVERHEAD PROFIT TOTAL Engineering Remarks                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    
  EUR        2.02         2.18           2.25                               0.72                             0.26           0.42           0.83           8.67  
  % 23% 25% 26% 8% 3% 4.9% 9.6% 100%  
  General Data Material Operation Labor Machining Tooling Wear Parts Over Head Profit Reduction Engineering  
 
 
     
 
 
   
       
   
    LANDMARK Automotive Cost Breakdown       
  EXHAUST TUBES Cost Breakdown Worksheet          
               
           
               
  OEM Data  
   
  Part #     Volume Quoted (Year) 10000        
  Part Name     Model Life (Year) 5        
  Ref. #     Delivery Rate (week) 208    
  Customer Name DANA   Delivery Rate (Month) 833    
  Buyer Name       Delivery Rate (Container Full)      
  Buyer E-mail     Delivered To      
  Buyer Tel #     Qutation Due Date 31-Jul-04    
       
  Quotation General Data  
       
  Date 07-Feb-06   Sample Lead Time 4 MONTHS   Quotation Prepared By  
    Sample Min Ship Qty 10.00   Name    
  Mfg Location LANDMARK Metal Works   Production Lead Time From Approval 3 MONTHS   Position    
  Mfg Duns # 535 274 021       Tel. #    
  Ship from Location LANDMARK Auto Parts - Free Zone   Setup Cost 10,000.00   E.Mail    
  Ship From Duns # 535 274 260   Design Cost 10,000.00    
        Quotation Approved By  
    Validation Cost 10,000.00   Name    
  Quoted Currency EUR   Prototype Cost 10,000.00   Position      
   
               
  General  Remarks    
     
   
  Material Cost                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      
   
A A1 A2 A3 A4 A5 A6 A7 A8 A9  
# Raw Material Item Description Purchased or Manufactured Unit of Measure Quantity Unit Cost Item Total Material Supplier Duns #  
1 tubes Purchased Kg 1.9000 1.0000 1.9000 ASMn443H ARCO     
2                    
3 Quenching Oil Purchased Kg 0.0950 1.0000 0.0950 Quenching Oil MISR P.    
4                    
5 Identification Tape Purchased PIECE 1.0000 0.0200 0.0200 Identification Tape EL NASR     
6                    
7                    
8                    
9                    
10                    
11                    
12                    
13                    
14                    
15                    
16                    
17                    
18                    
19                    
20                    
  Total Raw Material Cost             2.0150          
               
  Material Remarks    
     
   
  Operations Time                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      
       
       
B Working min. / hr # of hr / Shift # of Days / Year # of Bends Complexity      
50 7 240 8 1.4      
EUR Operation Time ( min )    
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11  
# Operation Description On Cycle Time Off Cycle Time % OFF/ON CYCLE Total Cycle Time (min) Total Cycle Time (hr) Total Cycle / hr # of Machines # of Shifts / Day Qty / Year over capacity  
1 BAR SHEARING 0.50 0.40 80% 1.26 0.021 39.7 1 1 66667 567%  
2 LENGTH CORRECTION 1.00 0.50 50% 2.10 0.035 23.8 1 1 40000 300%  
3 THREAD ROLLING 2.00 1.00 50% 4.20 0.070 11.9 1 1 20000 100%  
4 HEATING 2.00 1.00 50% 4.20 0.070 11.9 1 1 20000 100%  
5 BENDING 1.00 1.00 100% 2.80 0.047 17.9 1 1 30000 200%  
6 HEAT TREATMENT 1.00 1.00 100% 2.80 0.047 17.9 1 1 30000 200%  
7 CHECKING 3.20 1.00 31% 5.88 0.098 8.5 1 1 14286 43%  
8 GALVANIZING 0.95 1.00 105% 2.73 0.046 18.3 1 1 30769 208%  
9                        
10                        
11                        
12                        
13                        
14                        
15                        
  Total 11.65 6.90 80% 25.97 0.433            
               
  Operation Time Remarks    
     
   
  Labor Cost              
     
C EUR Direct Labor Cost Indirect Labor Cost Staff      
C1 C2 C3 C4 C5 C6 C7 C8 C9   C10    
# Operation Description High Skilled Mid. Skilled Low Skilled Quality  Maintenance Supervisors Else… Total # of Staff  %   Total Cost / Each Machine    
Salary per hour 2.00 1.50 1.00 2.00 2.00 2.50 1.20          
1 BAR SHEARING 1.00 1.00 0.5 0.20 0.20 0.25 0.10 3.25 13% 0.12    
2 LENGTH CORRECTION 1.00 1.00 0.5 0.20 0.20 0.20 0.20 3.30 13% 0.19    
3 THREAD ROLLING 1.00 1.00 0.5 0.20 0.20 0.25 0.20 3.35 13% 0.38    
4 HEATING 1.00 0.50 0.5 0.20 0.20 0.25 0.10 2.75 11% 0.32    
5 BENDING 1.00 1.00 0.5 0.20 0.20 0.25 0.10 3.25 13% 0.25    
6 HEAT TREATMENT 1.00 1.00 0.5 0.20 0.20 0.25 0.10 3.25 13% 0.25    
7 CHECKING 1.00 0.50 0.5 0.20 0.20 0.25 0.10 2.75 11% 0.45    
8 GALVANIZING 1.00 1.00 0.5 0.20 0.20 0.25 0.10 3.25 13% 0.24    
9                          
10                          
11                          
12                          
13                          
14                          
15                          
  Total 8.00 7.00 4.00 1.60 1.60 1.95 1.00 25.2 100% 2.18    
    32% 28% 16% 6% 6% 8% 4% 100%        
  Labor Remarks    
     
     
            Machinning Cost                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                
 
D EUR                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        
Ave. M/C Life (hr) 15000   Machine Detail Variable Cost  Fixed Cost     
D1 D2[1] D3 D4 D6 D7 D8 D9 D10 D11  
# Operation Description # of Machines Machine Size (Kw) Machine Type Total M/C Cost Electrical Cost Maintenance Cost Depreciation Fixed Cost  Burden Total   
  5% 40% 100%  
1 BAR SHEARING 1 3.0 Bar Shearing m/c       10,000 0.0032 0.0056 0.0140 0.0500 0.0728  
2 LENGTH CORRECTION 1 30.0 Lathe       10,000 0.0525 0.0093 0.0233 0.0500 0.1352  
3 THREAD ROLLING 1 5.0 Thread Rolling m/c       30,000 0.0175 0.0560 0.1400 0.0500 0.2635  
4 HEATING 1 30.0 ELMA m/c       20,000 0.1050 0.0373 0.0933 0.0500 0.2857  
5 BENDING 1 200.0 Hydroil Press       15,000 0.4667 0.0187 0.0467 0.0500 0.5820  
6 HEAT TREATMENT 1 60.0 Heat Treatment Unit       80,000 0.1400 0.0996 0.2489 0.0500 0.5384  
7 CHECKING 1 20.0 Fixture         1,000 0.0980 0.0026 0.0065 0.0500 0.1571  
8 GALVANIZING 1 30.0 Galvanizing Line       10,000 0.0683 0.0121 0.0303 0.0500 0.1607  
9                      
10                 0.0500 0.0500  
11                      
12                      
13                      
14                      
15                      
  Total Machining Cost 8 378.0        176,000 0.9511 0.2412 0.6031 0.4500 2.2454  
             
  Machiningl Remarks  
     
     
            Tooling Cost                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                
   
E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11  
# Tooling Type Pcs per Cycle Tools per Operation Tool Description Tool Cost  Lead Time (Weeks) Potential Source Cycles per Hour Pcs per Tool Life Cycle Tooling cost / Pc # of Tools / Year  
1 T-Tooling 1.0 1.0 KNIFE EDGE 30 8.0 CHINA 39.7 5000 0.0060 2  
2 F-Fixture 1.0 1.0 WELDING FIXTURE 200 4.0 SPAIN 23.8 4000 0.0500 3  
3 D-Dies 1.0 1.0 BENDING DIE 1,000 8.0 CHINA 11.9 15000 0.0667 1  
4 D-Dies 1.0 4.0 END FORMING DIE 3,000 8.0 SHANGHAI , CHINA 11.9 10000 0.3000 1  
5 F-Fixture 1.0 4.0 FIXTURES  400 6.0 EGYPT 17.9 5000 0.0800 2  
6 F-Fixture 1.0 1.0 FIXTURES  300 6.0 EGYPT 17.9 20000 0.0150 1  
7 F-Fixture 1.0 10.0 DIMENSIONAL FIXTURE 1,000 6.0 EGYPT 8.5 20000 0.0500 1  
8 F-Fixture 1.0 1.0 PAINTING & DRYING FIXTURES  300 6.0 EGYPT 18.3 10000 0.0300 1  
9 O-Other(Please Specify Below) 1.0 1.0   100 6.0 EGYPT   10000 0.0100 1  
10 F-Fixture 1.0 1.0 DIMENSIONAL FIXTURE 1,000 6.0 EGYPT   9000 0.1111 1  
11                        
12                        
13                        
14                        
15                        
Totals       7,330 8       0.7188    
               
  Tooling Remarks    
     
               
            Tooling - Wear Parts Cost                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              
   
F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11  
#  Wear Part Type Pcs per Cycle  Wear Parts per Operation  Wear Part Description Wear Part  Cost Lead Time (Weeks) Potential Source Cycles per Hour Pcs per Tool Life Cycle Tooling cost / Pc # of Ware Parts / Year  
1 Shear Blade 1.0 1.0 KNIFE EDGE 30 8.0 CHINA 39.7 5000 0.0060 2  
2 Wear Parts      0     0          
3 Wear plate  1.0 1.0 BENDING DIE 500 8.0 SPAIN 11.9 7000 0.0714 1  
4 Wear Parts  1.0 1.0 FIXTURES 200 8.0 CHINA 11.9 7000 0.0286 1  
5 Wear Parts  1.0 1.0 FIXTURES  400 6.0 EGYPT 17.9 5000 0.0800 2  
6 Wear Parts  1.0 1.0 FIXTURES & GAUGES 200 6.0 EGYPT 17.9 10000 0.0200 1  
7 Wear Parts  1.0 1.0 FIXTURE & GAUGES 300 6.0 EGYPT 8.5 10000 0.0300 1  
8 Wear Parts  1.0 1.0 PAINTING & DRYING FIXTURES  200 6.0 EGYPT 18.3 10000 0.0200 1  
9                        
10                        
11                        
12                        
13                        
14                        
15                        
Totals       1,830 8       0.2560    
               
  Ware Parts Remarks    
     
               
                 
G             G1 Total Manufacturing Cost 7.1585  
             
             
  Over Head Remarks          
                 
    G2 Selling, General and Administration  0.42235  
                   
                   
                   
  Profit Remarks                
      G3 Profit 0.8339  
               
    G4 Selling Price 8.4147  
                   
                   
                   
  Freight Remarks                
      G5 Freight Cost from Alexandria to Port    
               
    G6 Port Duties & Clearing Fees    
                   
                   
                   
  Packaging Remarks                
      G7 Non-Returnable Packaging    
               
    G8 Returnable Packaging     
   
               
  Reduction Schedules                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      
   
H H1    
  LONG-TERM Reduction Proposal - % Price Reduction New Price      
  After Year 1 3.0% 8.41        
  After Year 2 2.0% 8.24        
  After Year 3 2.0% 8.08        
  After Year 4 2.0% 7.92        
  After Year 5 2.0% 7.76        
    11.0%            
  Tooling Remarks    
     
               
            Engineering Remarks                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              
   
# Operation Description Operation Remarks  
1 BAR SHEARING    
2 LENGTH CORRECTION    
3 THREAD ROLLING    
4 HEATING    
5 BENDING    
6 HEAT TREATMENT    
7 CHECKING    
8 GALVANIZING    
9      
10      
11          
12                          
13                          
14                          
15                          
General Notes    
   
   
   
     
 
     
       
       
       
       
       
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   

[1]
fgfggbgnbjbCNC TUBE BENDING M/CCNC TUBE BENDING M/CCNC TUBE BENDING M/C